"Proposed" Budget for FY 2005 – 2006 Commentary

The savings that we are anticipating in the 2004/2005 fiscal year will be used to help fund the 2005 – 2006 FY budget.  Part of the savings will go to help pay the Berglund property loan, and the remainder will be used to restore our reserve in the savings account.

 

When we present a proposed budget to the District we are not able to increase the budget at the meeting.   Consequently, the budget as presented includes some items which might be desirable but are not essential, and the District may vote to reduce or drop some items in the budget. Items in the proposed budget which the board recommends for close review are marked with a “?” in the left column.

 

The District budget as proposed includes a number of increases which would produce tax increases of 21.8% for Hebron and 45.0% for Lebanon.  So that you might have a better understanding of the cause for these increases, the more significant increases as well as items which could produce savings are reviewed below:

 

Lake Expenses:

 

District Budget

The Board of Directors would truly like to see a much smaller increase in taxes than is presented in the proposed budget.  As an indication of how the taxes could be affected, if we drop funding for: hydro raking (-$10,000) and the use of a State trooper (part time) for security (-$300), and we approve use of Broadcaster as sole news bulletin to give public notices (-$400), the % increase for Hebron would change from 21.8% to 11.7%, and Lebanon would change from 45.0% to 36.1%.

 

Respectfully submitted,

 

David Arnold

Treasurer

 

 

 

Lake Expenses    (? items needing District review)
 2004-2005 Budget
Prop.
 2005-2006 Budget
Chg Comments
1-Office Supplies - stamps, paper, printer cartridges, copies   $200 $240 $40
2-Newsletters - (3) printing and stamps    $2,210 $1,850 -$360
3-Volunteer Refreshments   $200 $200 $0
4-Sanitation - Portapotties - 2 units, 5/15 to 9/15 = 4 months @ $180   $720 $720 $0
5-Gate Monitoring -  June 1 - Sept 7   $1,400 $1,400 $0
7-Security Services:  Wkends/holidays 7/1/05 to 9/5/05 & 5/28/06 to 6/30/06  subtot. $8,736 8980 $244
     7c) Use private security service only $8,680
     7b) Use State trooper 1 wkend a mo. in place of private security service $300     incr'd cost
8-Signs and Bulletin Boards   $280 $600 $320
     a) Remove old sign at Main Beach by the side of Deepwood Dr.    
     b) Remove old bulletin boards at main & Lollipop beaches & install  
          new larger boards with rain cover to protect bulletins
     c) Repair lake use rules signs at beaches and right-of-ways
     d) Install mulch & landscape cloth at Amston Lake sign by Duck Pond      
9-Memberships - CT Fed.of Lakes ($50), N. American Lake Mgrs ($175)   $150 $225 $75
10-Water Quality Mgmt subtot. $3,310 $3,205 -$105
    a) 9 visits to sample site produces 36 samples.  Lab fee $15 / sample $540
    b) 3 stream samples during hvy rain events produces 9 samples x $15 $135
    c) 3 lake perimeter E-coli samples during hvy rain events (Leb.) 18 x $20 $360
    d) 2 lake inspections and consultations by Lake Scientist $500
    e) 3 rain event storm drain samp. (Leb.) 6 samples x 3 events = 36 x $15 $270
     f) Year end analysis and report by Lake Scientist $1,400
11- E-coli testing at Main and Lollipop beaches  subtot. $1,560 $1,620 $60
     a) 6/1/06 to 9/1/06 = 12 wks x 6 samples ea. = 72 x $20  $1,440
     b) Possible retesting due to elevated E-coli counts   9 samples  x $20  $180    
12-Aquatic plant management / Lake Scientist - 2 visits & discussion     $500 $500
13-Weed Control - possible hydro raking of South East Cove 2006   $9,300 $10,000 $700      defer ?
15-ROW Maintenance - cut brush, weed whack, dump fees, sand repl'mt   $2,825 $2,000 -$825
16-Duck Pond Maintenance - weed whack, mow, cut brush, beaver      $700 $700
      fence repair, remove beaver dam debris from inside spillway 
      and the culvert under Deepwood, install fencing at top of dam      
17-Boat dock Maintenance     $150 $150
19-Beach maintenance - cut brush, weed whack, dump fees, york rake   $200 $1,500 $1,300 Incl. Lollipop
21-Lake Passes Printing - boat, car, and personal subtot. $2,100 $2,940 $840
      a) Printing $2,250
      b) Mailings - postage, envelopes and flyers $690     $0
23-Gasoline for lawn equipment     $300 $300
28-Mower equipment - tire chains & trailer   $425   -$425
29-Main Dam Maintenance   $1,500 $1,500 Dam expen. 
    a) Weed and brush removal, wet side of dam in 04/05 were 
    b) Brush cut on dry side of dam 3 times yearly were capital
    c) Mow and weed whack dry side swail area near parking area impr'mts 
    d) Remove graffiti and repaint pd by Dam
    e) York rake and seed top of dam area where trees were removed fund
     f) Install guard over outlet valve and T fitting
    g) Spread existing piles of mulch around newly placed boulders  
Lake Management Services (includes additional insurance req'mts)   $15,500 $16,870 $1,370 Act. In 04/05
Total - Lake Expenses: $49,116 $55,500 $6,384 was $16,870

 

Amston Lake District 2004-2005
Lake Expenses March 31, 2005
Category YTD Amt Budget Projected Amt Comments
1-Office supplies $204.43 $200.00 $240.00
2-News letters $657.80 $2,210.00 $2,210.00
3-Volunteer refreshments $25.00 $200.00 $200.00
4-Sanitation $494.50 $720.00 $720.00
5-Gate monitoring $976.91 $1,400.00 $1,400.00
7-Security services $4,960.00 $8,736.00 $8,736.00
8-Signage $0.00 $280.00 $280.00
9-Memberships $0.00 $150.00 $150.00
10-Water quality mgmt $1,500.00 $3,310.00 $3,310.00
11-Ecoli testing $600.00 $1,560.00 $1,560.00
13-Aquatic plant control $894.86 $9,300.00 $1,900.00
15-ROW mgmt & maintenance $26.84 $2,825.00 $2,825.00
17-Dock system & boat rack maint. $116.79 $0.00 $160.00
18-Landscaping & maintenance $11.95 $0.00 $12.00
19-Tree & brush cutting $15.07 $200.00 $200.00
21-Lake passes